|
Published: October 28, 2009 03:01 pm
VIDEO: NASA's moon rocket makes first test flight
MARCIA DUNN
Associated Press
CAPE CANAVERAL, Fla. — NASA's newest rocket successfully completed a brief test flight Wednesday, the first step in a back-to-the-moon program that could yet be shelved by the White House.
The 327-foot Ares I-X rocket resembled a giant white pencil as it shot into the sky, delayed a day by poor weather.
Nearly twice the height of the spaceship it's supposed to replace — the shuttle — the skinny experimental rocket carried no passengers or payload, only throwaway ballast and hundreds of sensors. The flight cost $445 million.
NASA said the flight was a tremendous success, based on early indications.
"Oh, man. Well, how impressive is that," said Jeff Hanley, manager of NASA's space frontier program, known as Constellation. "You've accomplished a great step forward for exploration," he told launch controllers.
It was the first time in nearly 30 years that a new rocket took off from Kennedy Space Center. Columbia made the maiden voyage for the shuttle fleet back in 1981.
Liftoff, in fact, occurred 48 years and one day after the first launch of a Saturn rocket, a precursor to what carried astronauts to the moon during the Apollo program. The Saturn V moon rockets were the tallest ever built, an impressive 363 feet.
Wednesday's launch, three years in the making, represented the first step in NASA's effort to return astronauts to the moon. The White House, though, is re-evaluating the human spaceflight program and may dump the Ares I in favor of another type of rocket and possibly another destination.
The test flight attracted a large crowd.
The prototype moon rocket took off through a few clouds from a former shuttle launch pad at 11:30 a.m., 3½ hours late because of bad weather. Launch controllers had to retest the rocket systems after more than 150 lightning strikes were reported around the pad overnight. Then they had to wait out interfering rain clouds, the same kind that thwarted Tuesday's try.
The ballistic flight did not come close to reaching space and, as expected, lasted a mere two minutes. That's how long it took for the first-stage solid-fuel booster to burn out and separate from the mock upper stage 25 miles up. But it will take months to analyze all the data from the approximately 725 pressure, strain and acceleration sensors.
Parachutes popped open and dropped the booster into the Atlantic, where recovery ships waited.
The upper portion of the rocket — all fake parts — were hurtled to an estimated altitude of 28 miles and then fell uncontrolled into the ocean. Those pieces were never meant to be retrieved.
It was all over in six minutes.
"Think about what we just did. Our first flight test and the only thing we're waiting on was weather," launch director Ed Mango told his team.
NASA contends the Ares I will be ready to carry astronauts to the International Space Station in 2015, four to five years after the shuttles are retired. But a panel of experts said in a report to President Barack Obama last week that it will be more like 2017, and stressed that the entire effort is underfunded.
The first Ares moon trip would be years beyond that under the current plan.
No matter what direction the Obama Administration takes, NASA managers expect to learn a lot from Wednesday's experimental flight, even if it's for another type of rocket. They said they already have learned a lot.
Hanley, for one, does not to hear anymore about the cloudy, electrically charged conditions — triboelectrification — that made it so difficult to get this test rocket off the ground. Future rockets will have proper protection.
"Whatever we end up flying, this will not be a problem," he promised.
___
On the Net:
NASA: http://www.nasa.gov/aresIX
|
|
|
Photos
|
|
|
|
|
 |
|
MECHANIC
Waterloo Coal Company is looking for a Heavy Equipment Diesel Mechanic. We offer competitive wages, excellent benefits, ...>MORE
NURSE PRACTITIONER / PHYSICIAN ASSISTANT
Local Huntington medical center is recruiting Nurse Practitioners or Physician Assistants for our hospitalist program. ...>MORE
RESIDENTIAL PROPERTY INSPECTOR
Needed. P/T, work own hrs, coverage area Northeast KY, fuel efficient car helpful. Please email resume to robh@insurance...>MORE
See all ads |
| Premium Cars, RVs and Boats |
Miata
1999 convertible, black, 113k, p/s, CD, a/c, $4,000. 836-4394....>MORE
DODGE CHARGER
‘08, low mi., fac. warranty, white, CD, all power, loaded, exc. shape, extra clean, $12,950. 606-571-2628....>MORE
CADILLAC BROUGHAM
CADILLAC- ‘88 Brougham 51k mi., $4800. Call 606-465-0560....>MORE
See all ads |
|
FARM FOR SALE
GREENUP CO- Leatherwood Rd. 100 acres, barn, hunting cabin, some timber, 2 ponds, four-wheeler trails, 3 acres of bottom...>MORE
SIX LOTS FOR SALE OR TRADE
Cedar Knoll, Briarwood area 606-547-5764...>MORE
RACELAND HOME FOR SALE
3 BR, 2.5 BA, 2 kitchens, 2 living rooms, newly remodeled brick house. 1118 Green Acres Dr. $124,000. Call (606)836-8808...>MORE
See all ads |
|
FITNESS CYCLE
LIFE FITNESS- Life Cycle 5500, new gym quality bike, $1700 new. Great Gift! $600 obo. 836-4889...>MORE
PUPPIES FOR SALE
MIN. PIN. PUPPIES- full stock 1 male $150, 3 females, $175 ea. Yorkie/ Shih Tzu mix, 2 males, $75 ea. 740-379-9176. ...>MORE
FIREWOOD FOR SALE
1 Full Rick Call 606-923-0717...>MORE
See all ads |
|
 |
|